Skip to content

Raleigh Inspection Portal May 2026

A: The portal shows specific code sections violated. Once corrected, schedule a re-inspection through the portal. Most re-inspections require a new fee.

A: No – assignments are made based on geography, permit type, and workload to ensure fairness. raleigh inspection portal

A: On the morning of your inspection, the portal status changes to “Assigned.” You’ll see the inspector’s name and estimated arrival window (updated when they are 15 minutes away, if GPS enabled). A: The portal shows specific code sections violated

A: Inspections may be delayed or rescheduled automatically for safety. The portal will notify you via email/text and update the status. Accessibility The Raleigh Inspection Portal complies with WCAG 2.1 AA standards. For ADA accommodations or alternative scheduling methods (phone/paper), call (919) 996-2500 at least 48 hours in advance. Last updated: March 2026 City of Raleigh – Inspections Division A: No – assignments are made based on

Back To Top
Search